Materials for a Better Tomorrow

Founded on fair business and sound environmental practices, we strive to exceed our customers’ expectations in every way by delivering innovative, quality materials at a fair price. That’s why Whitaker Contracting Corp is a leading aggregate supplier and is one of the most trusted sources of crushed stone, sand, and gravel in North Alabama.

While we’re proud to offer some of the highest quality limestone and sand products in the region, our greatest resource is our employees. Whitaker Contracting Corp employees are some of the most knowledgeable professionals in the aggregates industry. Their goal each day is to provide outstanding customer service and technical support to ensure that our products are delivered accurately and timely.

While it seems like only yesterday that our journey began, Whitaker Contracting Corp is excited about the future. Whether your material requirements are large or small, we stand ready to deliver. Because together – we can build a better tomorrow.

Looking Towards The Future: Read More…
Whitaker Contracting/Madison Materials Using Drone Technology


Sales – Joe McConnell
256-298-3918
Guntersville, AL 35976

Guntersville Limestone Quarry
256-582-2130
692 Convict Camp Road
Guntersville, AL 35976

#2 2 1/2″ to 3/4″
#5 1 1/2″ to 3/8″
#56 1″ to 1/4″
#57 1″ to 1/8″
#67 3/4″ to 1/8″
#78 1/2″ to 1/8″
#8910 1/4″ to dust (very little dust)
#810 1/4″ to dust (10% dust or more)
Block Chips 1/4″ to dust (10% dust or more, less 1/4″ material than #810)
Surge Rock 6″ to 2″ (up to 10″ when available)
Class 1 Rip Rap 100 pounds to 10 pounds
Class 2 Rip Rap 200 pounds to 10 pounds
Dense Grade Type B 1 1/2″ to dust (material wet; ALDOT Spec.’s)
1 1/2″ Crusher Run 1 1/2″ to dust
3/4″ Crusher Run 3/4″ to dust
Agricultural Lime 90% + passing #10 sieve / 50% + passing #60 sieve (90% + Calcium Carbonate / 10% H2O Maximum)


Brooksville Sandstone/Sand Plant
205-466-7916
222 Jones Road
Blountsville, AL 35031

#8 Sandstone 3/8″ to dust
#7 Sandstone 1/2″ to dust
#100 Concrete Sand 1/4″ to dust (less than 2% dust)
Masonry Sand

Summit Limestone Quarry
205-429-3807
2335 Hinds Road
Blountsville, AL 35031

#2 2 1/2″ to 3/4″
#5 1 1/2″ to 3/8″
#56 1″ to 1/4″
#57 1″ to 1/8″
#67 3/4″ to 1/8″
#78 1/2″ to 1/8″
#8910 1/4″ to dust (very little dust)
#810 1/4″ to dust (10% dust or more)
Block Chips 1/4″ to dust (10% dust or more, less 1/4″ material than #810)
Block Chips (PEP Screened) 1/8″ to dust (generally less than 11% dust)
Surge Rock 6″ to 2″ (up to 10″ when available)
Class 1 Rip Rap 100 pounds to 10 pounds
Class 2 Rip Rap 200 pounds to 10 pounds
Dense Grade Type B 1 1/2″ to dust (material wet; ALDOT Spec.’s)
1 1/2″ Crusher Run 1 1/2″ to dust
1/2″ Crusher Run 1/2″ to dust
Agricultural Lime 90% + passing #10 sieve / 50% + passing #60 sieve (90% + Calcium Carbonate / 10% H2O Maximum)

Adamsville Sandstone Processing Plant
4624 Flat Top Rd
Graysville, AL 35073

#2 2 1/2″ to 3/4″
#4 2″ to 3/8″
#5 1 1/2″ to 3/8″
#57 1″ to 1/8″
#67 3/4″ to 1/8″
#78 1/2″ to 1/8″
#8910 1/4″ to dust
#810 1/4″ to dust
Surge Rock 6″ to 2″
Class 1 Rip Rap 100 pounds to 10 pounds
Class 2 Rip Rap 200 pounds to 10 pounds
Dense Grade Type B 1 1/2″ to dust
1 1/2″ Crusher Run 1 1/2″ to dust

Whitaker Contracting

Whitaker Contracting